Leave Your Message

For Building & Construction Manufacturers

Pipe, Profile, PPR, and WPC Lines for the Building Trade

For window profile factories, pipe plants, building-material groups, developer captives. 11 years · 35+ countries · 200+ lines shipped · 75-day average lead time.

Window Profile Factories Building Pipe Plants Building-Material Groups Developer Captive Plants
ISO 9001 · CE · IEC 60204-1 · SASO-Ready · 11 Years
Building and construction site — JURRY supplies extrusion lines for the PVC pipe, window profile, PPR, and WPC materials used on site

Building and construction site context — JURRY supplies extrusion lines for the PVC pipe, window profile, PPR, and WPC materials that go into projects like this one.

Quick read, before the long version.

  • Four lines, one PLC family. PVC pipe, window and door profile, PPR, and WPC on a common recipe backbone.
  • ±0.1mm profile tolerance. Our dies hold the tolerance the gasket depends on, with documented IQC per shift.
  • 11 years · 35+ countries · 200+ lines shipped · 75-day average lead time. Our order band is $150K-$800K per line.
  • Per-diameter PVC pipe extrusion machine price tiers. We quote the line per diameter class so you do not over-spec on small pipes and under-spec on large ones.
  • CaCO3 filler strategy from 30-60 phr. Our recipes keep tensile and impact strength inside EN and ASTM window when resin prices spike.
  • CE, SASO, IECEE paperwork done before shipment. We host BV, SGS, TÜV inspectors and hand you the file set with the bill of lading.

Who We Build For

We do not sell to first-time owners, and we tell our sales team to walk away if we cannot match the buyer's certification spec. Because the lines we ship expect a real schedule and a real certification file. Our technical director, plant manager, supply chain manager, and quality manager clients tell us the same thing: a line without paperwork is a line they cannot put on the floor.

01

PVC Window Profile Factories

You already extrude casement or sliding profiles and need to add capacity, replace a worn die set, or move from 60mm to 80mm series. Our profile extrusion line drops into your existing downstream and your existing PVC pipe offcuts if you have them. We treat window profile extrusion line cost as a layered budget: extruder, die set, downstream, and PLC — each quoted as a line item so your CFO can see where the money goes.

Order band: $250K-$680K

02

Building Pipe Plants (PVC + PPR)

You run UPVC pressure pipe and drainage on one floor and PPR hot/cold on the next. We ship pipe extrusion lines and PPR pipe manufacturing plant modules that share spare parts with your existing haul-off and cutter. When we quote PVC pipe extrusion machine price, we do it per diameter class so you do not over-spec on small pipes.

Order band: $180K-$520K

03

Building-Material Groups with Pipe Divisions

Your group already sells cement, steel, or insulation and wants a pipe division. We supply the line, recipe library, and training plan so your group does not hire a separate plant team. Because your procurement runs across divisions, we can ship one UPVC line, one PPR PPR pipe manufacturing plant, and one WPC deck line on a single PO with one commissioning window.

Order band: $320K-$800K

04

Real-Estate Developer Captive Plants

You build residential towers and want your own supply of pipe, profile, and WPC decking. We consolidate the four product lines into a single turnkey scope with shared conveying and mixing, and one commissioning window. Our building & household industry reference list shows similar multi-line plants we have brought up in 5-7 months.

Order band: $450K-$800K+

01Dimensional Tolerance at the 0.1mm Level

PVC window profile cross-sections produced on a JURRY window profile extrusion line

PVC window profile cross-sections of the type produced on JURRY window profile extrusion lines. Dimensional tolerance at the 0.1mm level ensures proper sealing.

When a sliding window profile is off by 0.3mm on the outer frame leg, the EPDM gasket does not seal. We have seen the failure mode on audits: water ingress at the sill. Because sealing depends on geometry invisible on a flat drawing, we hold profile dies to ±0.1mm and document IQC samples per shift. The dimensional record is the same record your quality manager hands to the building inspector, and we publish the approach in our knowledge base so the math is not proprietary.

PVC window profile cross-sections produced on a JURRY window profile extrusion line

PVC window profile cross-sections of the type produced on JURRY window profile extrusion lines. Final tolerance is verified against your national window-standard spec.

Our die head for profiles uses a 3D-designed, CNC-cut mandrel. The downstream vacuum tank and cooling tank are sized for the specific profile cross-section, not a generic length, so the calibration geometry matches the die geometry. Because vacuum drift is the most common cause of an off-spec profile, we ship vacuum gauges with calibration certificates.

Because your quality manager will be asked for the certificate, we issue a dimensional report with 10 measured points per profile. If you need tighter than ±0.1mm on a critical face, we adjust the die and re-run the FAT. We ship to ISO 9001:2015 quality systems and we hand you the dimensional record as part of the same file. The line is also built to the EU Machinery Directive 2006/42/EC and IEC 60204-1 electrical safety requirements, which is what lets us sign the CE declaration of conformity on your behalf.

02Doubling Output Without Doubling Budget

JURRY PVC/wood-plastic composite line machine — factory reference photograph

JURRY PVC/WPC line of the type installed for building-material manufacturers. Final layout is engineered to your factory footprint and downstream.

A developer needed double the output. We quoted the window profile extrusion line cost in three tiers, including the multi-cavity die option. We doubled their line speed from 12 m/min to 22 m/min by upgrading the extruder, replacing the single-cavity die with a twin-cavity die, and adding a second haul-off caterpillar. Capex was about 60 percent of a second line.

Because our buyers run on tight capex, we engineer for output-per-meter before footprint. Our parallel twin screw extruders deliver higher specific output at lower melt temperature, which lets us hold line speed without burning the profile. The profile extrusion line ramps to stable output in 90 minutes.

For greenfield sites, our profile extrusion line can be configured with a multi-cavity die for sliding and casement profiles from day one, with a downstream sizing table that handles both 60mm and 80mm series without a mechanical changeover. We design the upstream PVC conveying & mixing system so the throughput does not starve the extruder, and we connect it to your single screw extruders if you already have one running.

If your plant manager is being asked to double output without doubling budget, our answer is rarely "buy another line." The honest answer is usually a higher-output extruder, a multi-cavity die, and a downstream that does not bottleneck. We model the capex delta for you inside a week, and we usually quote window profile extrusion line cost in three tiers so your finance team has a real comparison.

03Diameter Changeover in Under 4 Hours

A Riyadh plant manager was losing 9 hours every Friday switching from small-bore cold water to large-bore drainage. Because changeover is where OEE dies, we engineered it into the line. Our pipe line ships with a modular die head for pipes on a quick-change cart and a PLC with 200 recipes.

UPVC pipes produced on a JURRY PVC pipe extrusion line — factory reference photograph

UPVC pipes of the type produced on JURRY PVC pipe extrusion lines. Actual line configuration is built to your diameter and pressure-class spec.

The recipe memory covers extruder RPM, barrel zones, melt pressure, haul-off speed, vacuum tank vacuum, cutter length, and stacker count. When the operator loads recipe #17, the line ramps to stable in under 90 minutes, including the diameter changeover and the vacuum calibration re-set. From the operator's seat it is a single menu, not a checklist. Our pipe extrusion lines cover the full small-bore to large-bore diameter range and we hand you the recipe library on a USB drive at the FAT.

Because most of our customers run two diameters per shift, we sized the conical twin screw extruders for a wide RPM window. We publish PVC pipe extrusion machine price tiers per diameter class so the per-tonne cost drops as you add SKUs.

04High-Filler CaCO3 Formulations That Survive the Tensile Test

PVC door frames and panels produced on a JURRY PVC door frame making machine

PVC door frames and panels of the type produced on a JURRY PVC door frame making machine. Recipe library for frame extrusion ships with every line.

CaCO3 spikes are the most common reason we get calls to push the filler rate. Because pushing filler past the recipe ceiling cracks profiles in the field, we publish the ceiling we have validated rather than letting the buyer guess. Our window profile recipes hold 30-60 phr CaCO3 with TiO2 at 4-8 phr, and we share tensile data before commercial runs.

"We ran a 50 phr filler recipe on our casement line last quarter and the impact retention stayed above 70 percent."
— Composite plant-manager quote, JURRY QC Lab, 2026

The compounding side is where most factories lose the cost saving. Our PVC conveying & mixing system and online mixing system handle 30-60 phr filler without low-shear dispersion issues. Because we ship the recipe with the line, the operator does not need a PhD in rheology to keep the profile inside EN 12608 or ASTM D1785 spec.

Because we are asked about filler ceilings on every technical call, the answer we give is the same one our QC lab uses: 30-60 phr for window profile, 20-40 phr for pressure pipe, and 40-80 phr for drainage and conduit. We will not recommend outside that range without a tensile test in our lab. The line is built to ISO 1452 PVC-U pressure-pipe standards and we hand you the PVC door frame making machine recipe sheet on the same USB drive we use for pipe recipes. Our PVC pipe extrusion machine price reflects the diameter class and downstream length, and we publish the per-class table in the FAT file.

05Certification — CE, SASO, IECEE

PPR hot and cold water pipes produced on a JURRY PPR pipe manufacturing plant

PPR hot and cold water pipes of the type produced on a JURRY PPR pipe manufacturing plant. Pressure-class certification depends on the recipe and the QC records.

Certification is the difference between a line that clears customs and a line stuck in a bonded warehouse for six weeks. Because we ship to 35+ countries, our compliance team has built a CE / SASO / IECEE file template that we attach to every line that touches an EU, GCC, or IECEE market. The file includes the CE declaration under EU Machinery Directive 2006/42/EC, the IEC 60204-1 electrical safety file, and the SASO Saudi Standards CoC package.

For Saudi-bound shipments we host the SASO inspector at our Shanghai workshop for a 1-2 day FAT. We forward the original CoC, test reports, and invoice set with the shipment, and our compliance team stays on email for the first 90 days. We publish our compliance approach in our news feed.

Because most buyers also need product-side certification, not just line-side, we hand you the recipe-specific test data for EN 61386 conduit and ASTM D1785 PVC pipe pressure ratings alongside the line documentation. Our buyers have cleared building-standard audits across the EU, GCC, and Southeast Asia. If you need a jurisdiction we have not templated, our compliance team drafts one inside two weeks.

The Four Lines We Ship

Below are the four product lines we ship to building-material factories. Each card links to the underlying JURRY product page, the photo is a factory reference shot, and the spec list is what we publish in the FAT file. Our multi-line plants in the news archive show how the four lines share an upstream conveying system.

01 · PVC Pipe Extrusion Line
  • Diameter range: 16-800mm
  • Applications: water supply, drainage, electrical conduit
  • Output: up to 1,200 kg/h
  • Pressure class: PN6-PN25
  • Library: ASTM D1785 / ISO 1452

PVC pipe extrusion line · UPVC pipe · CPVC pipe · UPVC double outlet · UPVC four outlet · UPVC multilayer · HDPE pipe

02 · PVC Window & Door Profile Extrusion Line
  • Systems: sliding, casement, tilt-turn, door frame
  • Full die set for main + auxiliary profiles
  • Line speed: up to 25 m/min
  • Tolerance: ±0.1mm on critical faces; full die set for the PVC door frame making machine range
  • Recipe library: 30-60 phr filler

Profile extrusion line · Die head for profiles · Parallel twin screw

03 · PPR Hot/Cold Water Pipe Line
  • Pressure class: PN10-PN25
  • Structure: single / double / triple-layer co-extrusion
  • Diameter: 20-160mm
  • Applications: hot/cold water, radiator, underfloor heating
  • Standard: DIN 8077/8078

PPR manufacturing line · Conical twin screw extruders

04 · WPC extrusion line
WPC wood-plastic composite profiles produced on a JURRY WPC profile line

WPC wood-plastic composite profiles of the type produced on a JURRY wood-plastic composite line.

  • Resin system: PE / PP + wood flour composite
  • Applications: decking, wall cladding, fencing
  • Output: up to 800 kg/h
  • Wood flour: 50-70 percent
  • Line speed: up to 6 m/min

WPC line · Single screw extruders

Case Snapshots

Three recent orders we shipped to building-material buyers. We list them as narratives, not testimonials — order band, line type, and the time we had to bring it up.

A Saudi building-materials group ordered a PPR hot/cold water pipe line with co-extrusion for hot-side oxygen barrier, sized across PN20 and PN25 pressure classes. The line shipped with a SASO witness run and a documentation file we drafted in coordination with the buyer's customs broker. Total order was about $520K, delivery against a six-month building program. The window profile extrusion line cost for the Riyadh order sat in the same tier.

Role: Procurement Director · Country: Saudi Arabia · Year: 2024

A UAE window profile factory ordered a full profile extrusion line with sliding and casement die sets, multi-cavity tooling, and a downstream saw-and-stack line for 6m delivery. Buyer wanted line speed above 20 m/min and 50 phr filler recipes for GCC summers. Total order was about $680K, commissioned in two phases.

Role: Plant Manager · Country: United Arab Emirates · Year: 2025

An Iraq real-estate developer captive plant ordered a PVC drainage and conduit line with quick-change dies for site switches. The line shipped with our recipe library and a CE file the buyer used for both domestic supply and export to neighboring markets. Total order was about $340K, with a 75-day lead time.

Role: Technical Director · Country: Iraq · Year: 2023

Buying Decision Spec Table

Below is the eight-row spec table we share when buyers ask for quote comparison. We share it as a PDF via chelsea.qin@jurry.com.cn.

Diameter range 16-800mm pipe; 60-80mm profile; 20-160mm PPR
Monthly output target Up to 1,200 kg/h pipe; 25 m/min profile; 800 kg/h WPC.
Certification required CE we sign under EU Machinery Directive 2006/42/EC + IEC 60204-1; our SASO CoC; EN 61386 conduit; ASTM D1785 / ISO 1452 pipe
Power supply 380V / 50Hz three-phase (customizable to 220V/60Hz or 415V/50Hz on request)
CaCO3 filler target 30-60 phr window profile; 20-40 phr pressure pipe; 40-80 phr drainage / conduit
Changeover frequency 2-4 changes per shift; PLC under 90 minutes to stable
Delivery deadline 75 days pipe/PPR; 90-120 profile/WPC; 60 days express
Commissioning preference On-site engineer for 7-14 days, remote support for first 90 days, factory FAT optional

Questions We Get on Every Technical Call

What is the typical lead time?

Our average lead time is 75 days from PO to ex-works for standard PVC pipe and PPR, and 90-120 days for full window profile with our multi-cavity dies. Express slots compress this to 60 days for repeat-order configurations.

One multi-line or two specialized lines?

For most factories we recommend one supplier with modular die sets, because changeover logic and recipe memory converge on a single PLC. Splitting increases commissioning risk by 15-25 percent.

How does SASO inspection work?

We issue a SASO-compliant CoC package, host the SASO inspector at our Shanghai workshop for a 1-2 day FAT witness run, and forward the original CoC, test reports, and invoice set with the shipment. Adds about 10 working days to dispatch.

Maximum CaCO3 filler rate?

Our PVC window profile recipes are validated at 30-60 phr filler with TiO2 at 4-8 phr. Above 60 phr we recommend a parallel twin-screw with an intensive mixing section, and we share impact and tensile data from our in-house QC lab before commercial runs.

Changeover training delivery?

Our commissioning engineer runs a 3-5 day session at your plant covering die lift, vacuum calibration, haul-off setup, and PLC recipe save/recall. We issue a printed operator manual in English, Arabic, or Spanish, and remote support for the first 90 days.

Can I visit your factory first?

Yes. We host 1-2 day factory visits at our Shanghai workshop, and we book a week in advance. You can witness a live PVC pipe or window profile FAT run, audit our welding and assembly bays, and meet the engineering team. Send your travel window to Chelsea at chelsea.qin@jurry.com.cn.

Eric Wang

Production & Operations Director, Shanghai JURRY Plastic Machinery Co., Ltd. · LinkedIn

Eric leads our production and operations team, and 200+ lines to 35+ countries have shipped under his sign-off.

Ready to spec your line?

Send your diameter range, monthly output, certification market. We reply within one working day.

Chelsea Qin · chelsea.qin@jurry.com.cn

Tel +86 137 8897 3787 · WhatsApp

Shanghai JURRY Plastic Machinery Co., Ltd. · About JURRY · Contact · Knowledge · News